Project: To equip their advanced car manufacturing facility with a large fleet of high-performance bridge cranes designed for reliability and maximum operational safety.
The Guanhui Solution
Guanhui Crane engineered and installed a comprehensive fleet of bridge cranes tailored to Car’s production workflow. Recognizing the fast-paced environment of a major automotive plant, Guanhui integrated a critical safety feature as a non-negotiable standard across all units: Safety Warning Projection Lights.
The Guanhui Safety Standard in Action
These lights project a bright, clear line on the floor ahead of and behind the moving crane and load. This visual cue creates a highly visible mobile safety perimeter, providing an unambiguous warning to ground personnel. This proactive system is designed to protect the three most critical assets in any industrial environment:
The Operator & Personnel: By preventing accidental entry into the path of a moving load.
The Machine: By reducing the chance of collisions with other equipment.
The Goods: By ensuring a clear path for valuable automotive components and finished products.

Outcome
By making advanced safety a standard, not an option, Guanhui Crane provided car factory with a lifting solution that not only meets their performance demands but also reinforces a culture of safety on the factory floor. This project exemplifies the Guanhui principle: Safety is not just a promise; it is an engineering requirement.
